Español - English

Colorobbia

Date

January 01, 2013

Category
Assembly of mechanical installations, Installation and operations of large equipment, Isolation and facilities lagging, Maintenance of mechanical installations
About This Project

In order to install the cooling system of the one of the Colorobbia plants, Arumani has supplied, manufactured and assembled large diameter manifolds of carbon steel, as well as the assembly and modification of two tanks and the cooling plant with grupos de presión and production collectors. Within the project, there was also pipe, elements and deposits insulation and subsequent aluminum lagging.